Impairment (Impairment of Assets)
Impairment is the process of recognizing losses when the carrying amount of an asset exceeds its recoverable amount, in compliance with IAS 36 / CPC 01. The process is done in batches, with a mandatory technical report attachment.
When to Use
Apply impairment when there are indicators that an asset may have lost value, such as:
- Significant market decline
- Technological obsolescence
- Physical damage to the asset
- Adverse changes in the economic or legal environment
General Flow
- Create an impairment batch (period + reason)
- Add items to the batch (one asset per item, with the new recoverable amount)
- Attach the technical report (required to confirm)
- Confirm the batch — losses are automatically recognized in the result
Batch Status
| Status | Description |
|---|---|
| Draft | Batch under editing. Items and attachments can be added or removed. |
| Confirmed | Batch closed. Cannot be edited. Losses already recognized. |
Create an Impairment Batch
- Go to Operations → Impairment
- Click + New Impairment
- Fill in:
- Reason — Description of the loss reason (e.g.: obsolescence, accident)
- Period — Reference accounting period
- Description — Free-text note (optional)
- Click Save
Add Items to the Batch
- In the batch detail (Draft status), click + Add Item
- Fill in:
- Asset — Select the asset with an identified loss
- Fair Value — Recoverable amount assessed in the report (required, > 0)
- Click Save
The system automatically calculates:
- Carrying value before impairment
- Loss = Current carrying value − Recoverable amount
- The amount is posted directly to the Period Result (P&L)
info
Unlike revaluation, impairment never generates a gain — it only recognizes losses. If the recoverable amount is greater than the carrying value, no entry is made.
Batch Import
For large volumes, items can be imported via spreadsheet:
- In the batch detail, click Import
- Download the spreadsheet template
- Fill in asset data and recoverable amounts
- Upload the completed spreadsheet
Attach Technical Report
Confirmation requires at least one attachment:
- In the Attachments section of the batch detail, click Attach file
- Select the technical report (PDF, DOCX etc.)
- The file is linked to the batch for audit purposes
Confirm Batch
Prerequisites
- The batch must have at least one item
- The batch must have at least one attachment (report required)
- In the batch detail, click Confirm
- Confirm the operation in the dialog
- The system recognizes the losses and changes the status to Confirmed
After confirmation, the batch can no longer be edited.
Impairment Impacts
When confirming the batch:
- Each asset's carrying value is reduced to the informed recoverable amount
- The loss is posted as an Expense in the Period Result
- Future depreciation is recalculated based on the new carrying value
- The report remains archived and auditable